Semiconductor smart warehouse: bin AS/RS + CTU + lift AGV

Home › AGVs › Application cases › Semiconductor smart warehouse: bin AS/RS + CTU + lift AGV

Semiconductor | JATEN case study

A turnkey project for a semiconductor plant, automating everything from raw material receiving and production line delivery to finished goods shipping. Hardware includes high-bay racking (20,016 theoretical storage positions, compatible with 4 bin types), 4 bin stacker cranes, double-layer conveyor lines, a level-change lift, plus 4 CTUs and 1 under-lift AGV; software includes WMS, WCS and RCS, interfaced with the customer’s SCM system.

  • 20,016 theoretical bin storage positions
  • 232 bins/h stacker crane dual-cycle efficiency (theoretical)
  • 50% faster production line response
  • 40% higher space utilization

01 Choosing for your needs

The AGV types used in this project. Click through to see JATEN’s current models and specs.

02 Industries and scenarios

Problems before the project

  • Strict civil works requirements: the AS/RS requires floor loading ≥5000 kg/m² and flatness variation ≤3 mm/m².
  • Multiple floors and multiple machines: AGVs must work with elevators; stacker cranes, AGVs and conveyor lines operate together and are easily affected by network latency and task conflicts.
  • System data consistency: WMS connects to the customer’s SCM, and data must be real-time and consistent.
  • Maintenance capability: core parts such as servo motors and batteries need regular maintenance, demanding a lot from the customer’s technical staff.

JATEN’s approach

  • Double-layer conveyor lines: improve space use and conveying efficiency, supporting vertical level changes.
  • High-precision equipment: stacker crane repeat positioning accuracy ±5 mm; AGVs use QR code navigation and multi-level safety protection.
  • Three-layer system integration: WMS, WCS and RCS integrated for fully automatic dispatching and real-time monitoring across the whole process.
  • Compatible with 4 bin types: maximum size 600 × 400 × 230 mm, with room reserved in racks and equipment for expansion.

03 Technical notes and solutions

Results (published by JATEN)

  • Warehouse efficiency up by more than 30%
  • Automatic AGV delivery makes production line response 50% faster
  • Expected labor cost savings of 20%–30%
  • Space utilization up 40%
  • 24-hour response from JATEN during the warranty period

Bringing this to a factory in Taiwan: what to check first

  • Narrow down bin specifications: this project handles 4 bin types. The fewer bin types, the simpler the storage positions and equipment. JIAHON’s anti-static logistics totes come in 30 sizes.
  • Floors and load capacity: an AS/RS has strict floor requirements (loading ≥5000 kg/m²); existing buildings need a structural assessment first.
  • ESD and cleanliness: in semiconductor plants, bins and racks must account for static control and cleanliness, and this should be planned together with the equipment.

This case is a project published by JATEN, rewritten by JIAHON with the customer’s name withheld. Figures are project results published by JATEN; actual benefits vary with conditions of use. This describes typical cases; individual cases still need to be assessed.

Is your line like this project?

Tell us what you need to move, the floors and the routes; JIAHON can provide JATEN specification sheets and more similar cases, and assess on site at your plant.

Contact JIAHON | See all application cases

JATEN is a trademark of its owner.

Back to top