How to fill a PFMEA: 5 stages from process flow and failure modes to severity, occurrence, detection, RPN and follow-up

PFMEA (Process Failure Mode and Effects Analysis) is done before volume production. You walk down the process flow station by station and ask: what must this station achieve, how could it fail to, who is harmed if it fails, why could it fail, what stops it today, and does that control actually stop it? You then give three scores, Severity (S), Occurrence (O) and Detection (D), and multiply them to get the Risk Priority Number (RPN), which ranks what to fix first. Use the rating tables your customer or company specifies: public sources do not agree on the score range (1 to 5, 1 to 6 and 1 to 10 all appear). Multiplying into an RPN also has known weaknesses: equal scores do not mean equal risk, and the encyclopedia page says a 2019 automotive FMEA handbook switched to Action Priority (AP).

  • Draw the flow first, then list failures station by station. For each station write “what it must achieve”; the failure modes are the different ways of not achieving it. One failure mode can have several effects and several causes (stages 1 and 2).
  • S looks at the effect just. When a failure mode has several effects, rate the most serious one; S ignores how likely the failure is (stage 2).
  • Rate O and D separately. Occurrence looks at how often the cause appears (prevention controls count here; this is this article’s arrangement). Detection looks just at whether the detection control would catch it; if you do not know whether it would, give the worst score (stage 3).
  • RPN is a ranking tool. RPN = S × O × D. Items with high severity cannot be judged by RPN alone. Write which score each action lowers, re-rate with evidence, and align with the work documents (stages 4 and 5).

This article starts from “the customer or an auditor wants a PFMEA from you” and ends at “re-rate after improvement and align with the work documents”. For what audits ask, see What an SMT process audit asks, starting from the solder paste printing station. For one worked example of PFMEA used in an equipment decision, see Should we bring in this equipment? Jiahon completes the evaluation report for you. DFMEA (Design FMEA) on the product design side, how to fill a Control Plan, the full rating and AP tables in each handbook (which must be purchased) and software operation are outside this article. Each stage below says how to do it and what public sources say; stages 1, 3, 4 and 5 add what Jiahon can help with. Sources, exceptions and terms are in the notes at the end.

Figure 1. The five stages of PFMEA

  1. Define scope, draw flow: form a cross-functional team; draw the process flow, one station per row; write what each station must achieve. (Jiahon: process audit article.)
  2. Failure and effect, rate S: write “how it fails”; write “who it harms”; S takes the most serious effect.
  3. Causes and controls, rate O and D: one cause per row; prevention controls count in O; detection controls count in D. (Jiahon: digital microscope for visual inspection.)
  4. Calculate RPN, rank: RPN = S × O × D; look at S first, then rank high to low; use the threshold your customer specifies. (Jiahon: SPI evaluation case.)
  5. Improve, re-rate, track: each action states whether it lowers O or D; re-rate scores with evidence; align with work documents. (Jiahon: stencil tension meter, semi-automatic stencil inspection machine.)

Stage 1: define scope, draw the flow, bring the right people

A PFMEA is a table that follows the flow. If the flow is not drawn clearly, every later column will have gaps.

What to have readyA reasonable way to do itWhat public sources say
TeamPeople from process, quality, equipment and the floor work together; add a customer representative when the customer asksA quality society’s FMEA page: form a cross-functional team whose members know the process, the product and customer needs; usually representatives from design, manufacturing, quality, test, reliability, maintenance, purchasing and suppliers, sales, marketing and customers, and customer service
Scope and flowDraw the process flow, one station per row, and state where material comes in and where it leavesSame page: define the scope (concept, system, design, process or service) and its boundary first, and use a flow diagram so everyone looks at the same picture. A public online encyclopedia page: the input to a process FMEA is a breakdown of the process or job
Function and requirement of each stationFor each station write “what it does” (verb plus noun) and “how well counts as correct”Quality society page: describe functions as verb plus noun, then split into subsystems, parts or process steps as needed. Encyclopedia page: a list of functions is the starting point of a good FMEA
Existing dataPrevious PFMEA, complaints, defect records, work instructions, control planEncyclopedia page: experience from past similar products and processes is one of the inputs

How to do it:

  • Draw the process flow first, one station per row. For an SMT (Surface Mount Technology) line, for example, it can be split into printing, placement, reflow, optical inspection, rework, test and packing (illustrative).
  • For each station write clearly what it must achieve, in verb plus noun, for example “solder paste position correct”, “solder paste volume correct”, “component polarity correct” (illustrative).
  • Rate together with the people of that station: operator, equipment and quality should all be present; do not fill it in alone behind closed doors.
  • Put existing data on the table first: previous PFMEAs, complaints and defect records, work instructions, control plans.
  • When the process changes, the table changes with it: a new model, new equipment, a material change or a new supplier all mean going back to this table.

What public sources say: the table above. Quality society page: it can be used when designing or redesigning a process, before making a control plan, and when analyzing failures of an existing process. Encyclopedia page: update at the start of a new cycle, when operating conditions change, when the design changes, with new regulations, or when customer feedback shows a problem.

What Jiahon can help with: how audits ask about process documents and records: Jiahon’s published article What an SMT process audit asks, starting from the solder paste printing station.

Stage 2: list failure modes and effects, rate Severity (S)

The failure mode says “how it fails to be done”; the effect says “who is harmed if it is not done”; S looks at the effect just.

ColumnWhat to writeExample: printing station, insufficient paste (illustrative)
RequirementWhat this station must achieveCorrect paste volume
Failure modeWhat not achieving it looks likeInsufficient paste
EffectWhat the next station, later stations and the customer will meetOpen solder joints after reflow, rework needed; if it escapes, functional failure at the customer
Severity (S)Rate the most serious effectIn this article’s example, rated as “rework needed”

How to do it:

  • Write the failure mode first, as “what was not done” (insufficient paste, position shift, reversed polarity). Do not write it as a cause (wrong squeegee pressure is a cause; it comes in the next stage).
  • Then write the effect: think of what the next station will meet, then later stations, then the customer. One failure mode can have several effects.
  • S is rated on the most serious effect. S looks just at how severe the consequence is, not at how often it happens.
  • Classify effects, and give the same score to the same class. A common line practice is to sort effects into just a few classes (rework, partial scrap, scrap, return), give each class the same S, and then different people rate more consistently.
  • Use just one rating table: the one your customer specifies; if none is specified, use a company-defined one and write it into the documents. Do not mix two score ranges in one table.

What public sources say: Quality society page: severity runs from 1 (insignificant) to 10 (catastrophic); when a failure mode has several effects, record the highest value. Encyclopedia page: a failure mode is the specific way a failure occurs; an effect is the direct consequence of the failure on operation or on the user’s needs; severity looks at the extreme consequence; the page’s table runs severity from 1 to 5. The two pages use different score ranges. This article does not choose for you; follow the customer’s specification.

Stage 3: find causes, write current controls, rate Occurrence (O) and Detection (D)

One failure mode can have many causes. Each cause has its own prevention and its own detection, and each is scored separately.

One PFMEA row: how the columns connect (illustrative)

Requirement → Failure mode → Effect → Severity S (rate the most serious effect) → Cause → Current prevention control → Occurrence O (how often the cause appears) → Current detection control (catches it before it leaves) → Detection D (whether it is caught; the higher, the worse) → Risk Priority Number RPN (S × O × D, to rank) → Recommended action (lower O or D) → Re-rate (re-rate S, O, D and RPN; improve again if not enough).

ColumnWhat to writeExample: printing station, insufficient paste (illustrative)
CauseWhy it could fail; one cause per rowStencil aperture clogged; wrong squeegee pressure; solder paste not mixed enough
Current prevention controlWhat makes the cause not happen or happen less (already in the documents)Clean the stencil before line changeover; lock the print parameters
Occurrence (O)How often this cause appears under the current prevention controlsLook at past defect records
Current detection controlWhat catches the cause or the failure mode before it leavesFirst-piece inspection, paste thickness measurement, optical inspection
Detection (D)Whether the current detection controls catch it; the higher the score, the less likely it is caughtLook at the reliability and coverage of the detection method

How to do it:

  • List every cause of each failure mode one by one (man, machine, material, method, environment), one cause per row; do not squeeze them into one cell.
  • Write as current controls just what is already being done and already written in the documents. Prevention goes in the prevention column; detection goes in the detection column.
  • Occurrence: if you have defect records or process capability data such as Cpk, use the data; if you do not, rely on team experience and note that on the table.
  • Detection: look at detection controls alone; prevention controls do not count here (this article’s arrangement). When there are several detection methods, rate each one and take the better one. If you do not know whether it would be caught, give the worst score.
  • Even 100% visual inspection misses defects: when several people look and the defect is not obvious, be conservative with D.
  • When detection relies on measurement, the measurement system itself must pass first, or D cannot be trusted. For how to assess a gauge, see GR&R (GRR) repeatability and reproducibility: how to run and read Gauge R&R.
  • For failure modes at the printing station, to work back to causes, start with How to troubleshoot solder paste printing defects: work backward from what is printed to which consumable to change.

What public sources say: Quality society page: find all possible root causes of each failure mode; the page gives no rating table for occurrence and detection. Encyclopedia page: occurrence (the page calls it “probability”) is the likelihood that the failure occurs, with a table from 1 to 5; detection is the chance that the failure is found before the user notices it, with a table from 1 to 6, where 1 is always caught and 6 is not caught. This article did not find a public, complete 1-to-10 table for occurrence and detection; such tables usually come in the handbook the customer specifies.

An example of an audit finding gaps. One process audit listed more than ten findings, including places where the control plan and actual practice did not match: the audit listed a requirement for monthly X-ray inspection, and the page also shows follow-up questions about where the records are and who judges; the maintenance check sheet lacked items it should cover; and for solder paste past its use-by period, the trace led to a missing start time. The source file shows just the follow-up questions on the page and does not say how they were checked. The countermeasure was to write frequency and record location into the specification, and for the paste case to train all shifts. The example is a reminder that the current controls written in a PFMEA (how often, who judges, where the records are) must match actual practice and records, so that they can be answered at an audit.

What Jiahon can help with: visual inspection after placement or reflow: 4K 3D digital microscope (the page says it has a built-in measuring system and a direct-view screen). For price and stock, please inquire.

Stage 4: calculate RPN and set priorities

Each “failure mode + cause” gets one RPN = S × O × D. The number is used just for ordering; it is not a measure of the amount of risk.

The scores below are this article’s own, for illustration (1 to 10; the higher the worse):

Failure mode (illustrative)SODRPN
Minor cosmetic contamination366108
Insufficient paste53690
Reversed polarity, functional failure92590

Figure 3. RPN ranking can be reversed (illustrative; scores in the table). Cosmetic contamination: happens often, small consequence, RPN comes first although the consequence is slight. Insufficient paste: in the middle, same RPN as the one below. Reversed polarity: rarely happens, large consequence, same RPN as the one above it, severe consequence.

Two things to see: first, cosmetic contamination has the top RPN although its consequence is slight, while reversed polarity has a severe consequence but ranks later; second, the last two rows have the same RPN yet completely different risk profiles, one frequent with a small consequence, the other rare with a large consequence.

How to do it:

  • Calculate one RPN for each “failure mode + cause”; one per row.
  • Look at S first: items with high S (affecting safety, regulation or customer function) need a stated treatment whatever their RPN; then rank by RPN from high to low.
  • The threshold for action (act when RPN is above some value) is whatever the customer or company specifies; public sources give no universal threshold.
  • When scores are the same, look at all three scores, not just the product.
  • If the customer requires Action Priority (AP), follow the customer’s table; do not convert from RPN yourself.

What public sources say: Encyclopedia page: RPN = severity × occurrence × detection; the scores are ranks, not quantities, so after multiplying a lighter failure can rank ahead of a heavier one; the page says an automotive FMEA handbook from 2019 replaced the old risk matrix and RPN with Action Priority (AP), and gives no AP table. Quality society page: no universal RPN threshold; its example has several RPNs above 125 that all fell below 125 after improvement, which the page treats as acceptable. That is how that example worked, not a universal threshold. An international pharmaceutical quality risk management guideline (ICH Q9): the output of FMECA (FMEA plus severity, probability of occurrence and detectability) is a relative risk score for each failure mode, used for ranking.

What Jiahon can help with: how an equipment decision uses PFMEA to rank risks: Jiahon’s product page SPI evaluation: using pFMEA to show paste volume as a high-risk item, where three failure modes in the printing step are each given S, O, D and an RPN, and then checked by a test on a real machine. The long version of the same case is Should we bring in this equipment?. For price and stock, please inquire.

Stage 5: improve, re-rate and track

Each action should state which score it lowers. After it is done, re-rate with evidence and align with the work documents.

ColumnWhat to writeExample: insufficient paste (illustrative)
Recommended actionWhat to do and which score it lowersAdd a paste volume check after printing (lowers D); set a stencil cleaning rule (lowers O)
Owner and due dateWho, by which dayName and date
Action takenWhat was actually done, with the document or change orderWork instruction revised
Re-ratingRe-rate S, O, D and calculate RPNSee the table below

The scores in the table below are also this article’s own, for illustration:

Insufficient paste (illustrative)SODRPN
Before improvement53690
Add paste volume check just (lowers D)53345
Then add stencil cleaning rule (lowers O)52330

S did not change: S looks at the effect, so unless the design or the flow is changed to make the effect lighter, actions can lower just O and D.

How to do it:

  • First think how to stop it happening (lower O), then how to catch it (lower D). S usually comes down just by changing the design or the process flow.
  • Re-rating needs evidence: change orders, revised work instructions, data. Do not just lower the scores once the work is done.
  • After the change, align: work instructions, the control plan and inspection sheets must match what the PFMEA says. A common failure on the line: for the same station, the sampling frequency, pre-bake condition, first-piece timing or program verification method is worded differently in the control plan and in the work specification. How to check: compare the two documents station by station. Fix: use one wording, and revise both documents together from then on.
  • Keep the old version and update just the pages that changed. Update when the flow, equipment, material, supplier or complaints change.
  • Put it on a periodic review: treat the PFMEA as a document that gets updated, not one that is filed once it is done.

What public sources say: Quality society page: an FMEA records the knowledge and actions of the moment and continues until the end of the life of the product or service; the example’s actions bring high RPNs below 125. Encyclopedia page: during hardware development an FMEA should be a “living document”; for when to update, see stage 1. ICH Q9: FMEA can be used to rank risks and also to monitor the effect of risk control measures; FMEA depends on understanding of the product and process.

What Jiahon can help with: adding detection at the printing station: stencil tension meter (the page lists two measuring ranges; used to confirm whether stencil tension has decayed) and semi-automatic stencil inspection machine (the page says it can detect 13 defect types, for example contamination, damage, foreign matter, burrs, residue and misalignment; currently available for pre-order). For price and stock, please inquire.

Further reading

To look at the related process steps together, continue with these:

Worked example: PFMEA for the solder paste printing and reflow stations of an SMT line

The table below is summarized from an actual PFMEA (version 6) of an electronic product SMT line, taking just the solder paste printing and reflow stations. When reading it, look first at which “current control” each row’s “cause” maps to. In a good PFMEA, every cause maps to a specific detection tool, not just “first piece”.

StationFailure modeEffectSCauseCurrent controls (prevention / detection)ODRPN
Solder paste printingTombstoning / open jointRework5Paste not pre-mixed enoughFirst-piece inspection, paste thickness measurement3230
Solder paste printingTombstoning / open jointRework5Wrong squeegee speedFirst-piece 20X microscope, printer 2D inspection2220
Solder paste printingTombstoning / open jointRework5Wrong squeegee pressureFirst-piece thickness check, printer 2D inspection2220
Solder paste printingTombstoning / open jointRework5PCB thickness parameter set wronglyBarcode confirmation in the pass-through system2220
Solder paste printingDefective solder pasteRework or partial scrap6Wrong paste usedForm record, date marking1742
ReflowTombstoning / open jointRework5Wrong oven profile (insufficient temperature)First-piece inspection, AOI3460
ReflowSolder on gold fingersScrap7—First-piece inspection, AOI3484

Note: the cause and occurrence cells of the last row are blank in the source file; occurrence is inferred from RPN 84 = 7 × O × 4.

Three things this table shows

  1. Where detection is weak is where a tool is missing. At the printing station most causes have first-piece, thickness measurement or 2D inspection, and D is held at 2. “Wrong paste used” relies on a form and date marking, D is 7, and it is the weakest item at the printing station. To lower it, a physical control on paste issue and warm-up works better than adding another manual check, for example managing the order with a solder paste first-in-first-out fixture and making the pre-mix thorough with a solder paste mixer.
  2. The reflow station has higher RPNs than the printing station. A wrong oven profile is seen at first piece or AOI (D = 4); solder on gold fingers has a scrap consequence (S = 7), and RPN 84 is the highest row of the two stations. Moving the profile check from “look at the result on the first piece” to “measure the profile before the line starts” is the most direct way to lower D: fix a K-type thermocouple wire to the test board, connect a reflow profiler, run one pass, and confirm peak temperature and time above liquidus before starting the line.
  3. Controls need a frequency. The control plan of the same line says: stencil tension, 5 points at each line changeover; paste thickness, 5 points at each line changeover; peak temperature, at each model change; plus 1 measurement at the start of each morning shift. Items such as “paste thickness measurement” and “first piece” in the PFMEA need how often and how many points written in the control plan before they count as truly implemented. Stencil tension can be measured with the stencil tension meter; for 100% paste thickness inspection, see SPI evaluation.

Notes: sources and exceptions

This part is for readers who need to check; the practices above stand without it. When your customer’s specification or handbook differs from this article, follow them.

Sources for each practice

PracticeContentSource
FMEA stepsTeam, scope, function, failure mode, effect, severity, cause; severity 1 to 10; the example’s RPN and 125A quality society’s FMEA page (page marked as reviewed November 2024; web data also marks © 2026 ASQ; no rating tables for occurrence and detection)
Terms, RPN and its weaknessesFailure mode, effect, severity, probability, detection; RPN formula; reversed ranking; Action Priority (AP); when to updateA public online encyclopedia page (no date in the page body; web data marks last edited 2026-09-18; the page’s tables use 1 to 5 and 1 to 6)
Use and limits of FMEADescription, uses and limits of FMEA and FMECAInternational pharmaceutical quality risk management guideline ICH Q9(R1) Annex I.2 and I.3 (cover marked as adopted 18 January 2023; does not discuss RPN and gives no S, O, D rating tables)
Jiahon’s own materialThe equipment decision example, product pages, published articlesJiahon product pages and articles
Line practiceOne row per cause of a failure mode, prevention and detection controls in two columns, one S per effect class; control plan and work specification compared station by station; PFMEA rated before and after improvement (no company, model or date given)Compiled line practice (source documents not public)

This is the general case and still depends on the individual situation.

Exceptions and limits

  • Nature of the data: The statements come from one quality society page, one encyclopedia page and one international pharmaceutical quality risk management guideline. The text of the automotive FMEA handbooks and standards such as IEC 60812 (which must be purchased) was not read; their rating tables and AP tables are not in this article.
  • Sources with a position: The encyclopedia page is a public page anyone can edit; ICH Q9 is a guideline for pharmaceutical regulation, not an electronics manufacturing standard.
  • Where sources disagree: The score range (the quality society page uses 1 to 10 for severity; the encyclopedia page’s tables use 1 to 5 and 1 to 6) and the RPN threshold (no universal value; the 125 on the quality society page is just how its example worked). This article lists both and does not judge.
  • Editions and dates: The quality society page is marked as reviewed November 2024; the encyclopedia page body shows no date and web data marks last edited 2026-09-18; the ICH Q9(R1) cover is marked as adopted 18 January 2023.
  • This article’s own examples and calculations: The failure modes, scores and RPNs in stages 4 and 5 (108, 90, 90, 45, 30) are this article’s own illustrations, not figures from any standard, customer or real process.
  • This article’s arrangement and suggestions: Splitting PFMEA into five stages (define scope, list failures and effects, find causes and controls, calculate RPN, improve and track); “occurrence counts prevention controls just and detection counts detection controls just” (following common wording in automotive handbooks; the handbook text itself was not read); “if you do not know whether it would be caught, give the worst score”; “use data first, otherwise experience, and note it”; “look at S first, then RPN”; “lower O first, then D; S comes down just by changing design or flow”; “give the same S to the same class of effect”; “align with work instructions and control plan after changes”; “100% visual inspection also misses defects”.
  • Line practice: Practices differ from factory to factory; follow the verification of your own process.
  • Scope: This article does not cover DFMEA, how to fill a control plan, AP tables, FMECA criticality calculation, software operation, or threshold values required by customers in each industry.
  • Equipment and products: Specifications are as on each product page. The semi-automatic stencil inspection machine is currently available for pre-order.

This article is a summary of the general case. It is not a paraphrase of the standard text, not an endorsement of any one vendor, equipment maker or service provider, and not an assurance for your product or process. Follow your customer’s specification, the regulations where you operate, and your own verification. This is the general case and still depends on the individual situation.