What does an SMT process audit ask? Starting from the solder paste printing station, 6 stages to prepare line documents and records

When a customer audits an SMT process, every station asks the same four things: is the rule written down, is it followed on the floor, is the record kept, and who handles it when a limit is exceeded. The order for getting ready is: self-assess against the customer’s audit form first, then, starting from the solder paste printing station, fill in the gaps station by station.

Questions are grouped by station. A common audit form is divided by station such as printing, placement and reflow, and each question has three outcomes: done, not done, not applicable. According to older material Jiahon has consulted, a common PCBA (circuit board assembly) supplier audit form sets a pass line at about 80% of the total score, and a single station below about 80% results in a downgrade. This is the setting of one form, not a standard.

Questions follow a fixed pattern: is there a rule (document), is it followed on the floor (practice), is there evidence (record), and who handles it when a limit is exceeded (disposition). If any one of the four is missing, that question earns no points.

Public documents are also arranged by station: IPC’s SMT Process Guideline and Checklist (IPC-S-816), issued in 1993, has chapters arranged as handling, incoming inspection, solder paste application, component placement, reflow, cleaning and repair; each chapter lists common problems, causes and suggested corrections, and can serve as a skeleton for self-assessment.

For how a whole line works, see How does an SMT line really work? Printing, placement, reflow and quality control in one article; for the four documents needed on board washing and cleanliness, see How do you prove a circuit board is clean? The four documents that pass a customer audit the first time. This article starts from “what each question on the audit form is asking, and what to bring out on the floor”, and covers three stations — printing, placement, reflow — plus environment, ESD and documents. Each stage below says how to do it and what Jiahon can help with; sources and exceptions are in the notes at the end.

Figure 1. Every audit question asks four things; prepare station by station: printing first, then placement and reflow, then environment, ESD and documents (schematic).

Stage ①: first understand how the audit asks and scores, and self-assess

Audit forms usually have a fixed skeleton; know the skeleton first, and you will not miss things when preparing.

ItemCommon practiceWhat you should prepare
SectionsDivided by station (printing, placement, reflow, hand insertion, wave soldering, test, inspection, repair); each section is further divided into work instructions, materials, machine capability and finished-product inspectionGet the form from the customer first, and check question by question
ScoringThree outcomes per question: done, not done, not applicableA reason is needed for “not applicable”
Pass linePer older material consulted: about 80% of the total score; a single station below about 80% is downgraded or asked to improveFill in the low-scoring stations first
ScopeA new supplier gets an audit of all stations; an existing supplier may be audited on just a few stationsEvery station needs a self-assessment
Self-assessmentSelf-assess before the audit, and explain the score of each question to the auditor before the meetingA self-assessment form with evidence for each question
EvidenceOn audit day they look at documents and at the floorDocuments complete and the floor compliant; neither can be missing

Every question can be broken down into the same set of asks; when preparing, check in this order:

  • Rule: is it written in the work instruction, control plan or specification? Is there version control?

  • Practice: do the people on the floor know it? Do they follow it?

  • Record: is there a record with signature, date and values? If you pick one at random, can it be found?

  • Disposition: when the range is exceeded, is someone handling it, and where is the evidence of the handling?

In self-assessment, do not look just at “is there this document”. Per older material consulted, what auditors often follow up on is: where is the specification, how do you read the record, and who makes the judgement. When these three can be answered, it counts as done.

The public IPC-S-816 was issued early and process technology has since evolved, so for the questions follow the customer’s form; its value is the way the chapters are arranged, and the “common problem, cause, correction” way of writing for each station.

The tables in the later stages are compiled from an audit form Jiahon consulted earlier and rewritten as general questions that name no one; different customers have different questions and emphasis, so follow the form you receive.

What Jiahon can help with: this stage is a job of organizing information, and nothing needs to be bought. Jiahon also does not offer audit coaching or auditing on your behalf.

Stage ②: the solder paste printing station: paste, stencil, squeegee, board, machine, board-out inspection

Per older material consulted, of the three stations of printing, placement and reflow, this one has more questions, because printing is the starting point of solder quality. The first group of questions at each station on an audit form is mostly the work instruction; then the auditor goes to the solder paste refrigerator, the stencil rack and the printer, and checks item by item.

ItemWhat the audit asksWhat to bring out
Work instructionVersion controlled and containing details specific to this product? Available on the floor and followed? Handwritten ones signed and dated?State the paste type and powder size, stencil number and loading direction, squeegee, the number and height of support blocks or pins, the machine program name, board part number and revision; and state that metal tools must not be used to scrape or smear solder paste
Solder pasteIs there a procedure for refrigeration? Is the temperature within the range the paste maker recommends? First in, first out? What is marked on the jar? How long at most can paste stay on the board?The refrigeration procedure; a continuous record of refrigerator temperature (readable without opening the door), periodic checks, and evidence of handling when out of limits; jar labels showing the cold-storage expiry date, time taken out, usable time, and the room-temperature expiry time for opened and unopened jars separately; the maximum time from printing to the oven; the rule that operators wear gloves
StencilHow is it stored and marked? How often is it cleaned, and is it checked for damage after cleaning? Is tension measured periodically? Are there documents for custom specifications and the first article?A storage rack that prevents damage and dust; a label visible even when the stencil is on the rack (matching board part number, revision, side); the cleaning procedure (fluid, wash time, dry time, consumables); maintenance procedure and records for the cleaning machine; inspection and tension records; the custom specification (size, thickness, aperture ratio, orientation, markings); the first-article procedure (tension, thickness, aperture size, first print)
SqueegeeAre length, angle and material hardness specified? Is it checked for damage before and after use?Specification sheet, inspection records, storage method; how it is levelled before use
BoardAre handling and exposure of the board controlled? Does the board part number match the assembly part number and revision? How are misprinted boards cleaned?Board handling rules; part number and revision cross-reference; board washing procedure (fluid, wash time, dry time, consumables), and the fixture used for washing
MachineAutomatic alignment? How often is the stencil wiped and with what wiper paper? Do programs have versions and access rights?A wiping frequency set according to the board technology; the specification of low-lint wiper paper; the cross-reference of program version to board part number; program access rights
Board-out inspectionIs every board inspected after printing? Where is the acceptance standard kept?Inspection records; the acceptance specification kept beside the printer and available on the floor

Several questions are often overlooked.

What Jiahon can help with:

Refrigeration, warming-up and stirring:

  • Solder paste first-in-first-out fixture: stainless steel, 24 × 2 = 48 jars, goes straight into the solder paste refrigerator; newly stored jars are pushed to the back automatically, so the front is always the earlier batch, and it can be combined with barcodes and ERP (enterprise resource planning) for batch traceability.

  • Temperature recorder (external probe type): range −30 to +70°C, accuracy ±0.5°C, the probe is an external flexible cable; the LCD shows live, peak, minimum and average values, memory 35,000 readings, and the battery runs about 180 days continuously. Use it for the continuous record of refrigerator temperature.

  • Solder paste warming-up machine: sealed warming-up, holds 500 g jars of paste, each work position can be set to its own temperature and has an alarm; the page summarizes three rules for warming up: keep the whole jar sealed, at least 2 hours, and no heat source above 25°C to speed it up.

  • Solder paste stirring knife: 25 × 250 mm, blade thickness 1.5–5 mm; use it after warming-up is complete.

Stencils:

  • Stencil tension meter: mechanical, no power needed; two models, 7–50 N/cm and 7–80 N/cm, full-scale error ±5%, with a standard calibration glass; the page advises periodic calibration.

  • Semi-automatic stencil inspection machine: 38-megapixel camera, detects 13 defect types, maximum inspection size 800 × 800 mm, and the software can take photos, record video, and measure length, width and angle. Currently pre-order; ask for the arrival date.

  • Stencil frame rack: carbon steel with an antistatic coating and antistatic wheels; three inner clearances by stencil frame thickness; a single layer holds 20–38 pieces.

  • The stencil itself is a custom item, and Jiahon has no product page for it.

Cleaning:

  • Dual-tank auto-door stencil cleaning machine: washing, rinsing, air-knife drying and heated drying are all automatic; it can take two 750 × 750 mm stencils at once; solder paste washing takes about 2–5 minutes, rinsing 1–3 minutes, drying 3–5 minutes. For choosing electric or pneumatic, and for the before-shift and after-shift routine and maintenance plan, see How to choose a stencil cleaning machine.

  • Stencil wiper paper: double-layer spunlace structure of 55% natural wood pulp and 45% polyester; paper width 350–850 mm, minimum order one carton.

  • Stencil cleaning fluid: three board-cleaning fluids for no-clean and rosin fluxes; please give the flux and process conditions to be cleaned when asking for a quote; the safety data sheet can be requested.

  • Fully pneumatic misprinted-board cleaning machine: cleaning area 560 × 610 × 160 mm, spray tank 60 L, washing and air-drying times each adjustable within 0–99 minutes, and the fluid is circulated after passing three 0.15 μm filters.

Squeegee, support and equipment:

Stage ③: the placement station: changeover check, first article, nozzles and feeders, throw rate

The questions at the placement station revolve around one thing: after a part or line changeover, how do you confirm that the right part in the right orientation is being placed?

ItemWhat the audit asksWhat to bring out
Work instructionIs the loading information complete? Is it version controlled?Part number and description, head and station position, reference designators and quantity, feeder type, program name
Changeover checkIs there a second person to check and double-sign line and part changeovers? Can the lot numbers of critical parts be traced?Loading check sheet (loader signs, checker countersigns, done before start-up); lot number record
First articleIs the first article checked against a document for missing parts, wrong parts and polarity? Are values measured for resistors and capacitors?First-article record (signed off before start); a value record measured on one piece of every part number; a record of measuring again when a reel is changed
PolarityIs there a standard for tape and tray orientation? Is polarity still right after reloading a reel?The orientation standard; the working rule for reloading a reel
NozzlesIs there a document for the nozzle configuration? Is nozzle centring done every day?A nozzle configuration table for each machine model (the range of part sizes each nozzle can place); daily centring records
FeedersDoes each one have a unique number? Does the maintenance plan keep records by number? Are feed counts counted, with a reminder for maintenance when the count is reached?Feeder numbers and maintenance records; feed count statistics
SupportAre support blocks or pins needed? Are position, type and height recorded for each product?A position diagram per product, or a fixture that marks the positions
ProgramIs the program generated from CAD coordinates? Are local fiducial marks used for fine-pitch parts? Are parts still moved by hand?The cross-reference of program version to board part number; the naming rule for part shape codes
Board out and thrown partsIs placement accuracy spot-checked before reflow? How often is the throw rate reviewed, and what is the limit? How are thrown parts handled?Spot-check frequency and records; throw rate specification per feeder, the limit on skips per nozzle on a machine; the disposition procedure for thrown parts (resistors and capacitors are not reused after being thrown); the procedure for deviations of hand-placed parts

The component placement chapter of IPC-S-816 divides common conditions into wrong orientation, wrong part, missing part, misalignment and part damage. What the audit asks is how those conditions are stopped on your floor: the changeover check stops wrong parts, the first article and polarity standard stop wrong orientation, and the throw rate and nozzle maintenance stop missing parts.

What Jiahon can help with:

Stage ④: the reflow station: set values, temperature profile, post-oven inspection, process data

The audit focus at the reflow station is: the oven on the floor runs the same set of parameters as the document says and as was originally validated.

ItemWhat the audit asksWhat to bring out
Set valuesAre the conveyor speed and zone settings on the instruction the same as in the machine program?The instruction cross-referenced to the program; the program name
ProfileCan the profile for this product be produced? Do the settings when the profile was recorded match the current program?One profile per product, with the zone settings and conveyor speed at the time of recording
Process windowIs there an engineering specification that sets an acceptable window? Is it based on the paste maker’s recommendation but narrower? Is the profile within the window? Can the reason be stated when it is outside? Does it meet the component makers’ reflow requirements?The window specification; a cross-reference of the solder paste datasheet and component datasheets; analysis and evidence when outside the window
ThermocouplesHow are the placement points chosen? Has a bill of materials (BOM) review been done to confirm the profile fits all special parts? Are the thermocouples fixed on solder joints of the board?How the points are chosen; BOM review records; fixing with high-temperature solder or conductive adhesive; the board used for the first profile kept as an engineering sample
MachineIs the reflow technology right for this product (forced convection, enough zones)? Is exhaust flow controlled and monitored regularly? Does a fan failure raise an alarm automatically?Exhaust flow range and monitoring records; fan failure alarm; program version and access rights
Post-oven inspectionIs every board inspected (by eye or AOI)? Where is the appearance standard? Is the inspection template version controlled?The appearance standard; inspection templates (missing parts, unplaced positions, polarity), with the template version matched to the design change level of the product; inspection records
Process dataIs there statistical process control (SPC)? Are defects per million opportunities (DPMO) and defects per unit (DPU) watched in real time and used for decisions?Control charts and disposition records; how DPMO and DPU are calculated

DPMO is how many errors actually occurred per million chances to go wrong; DPU is the average number of defects per board. The in-process calculation is defined in IPC-9261A; the end-item calculation is in IPC-7912A. The appearance standard often means IPC-A-610; its division of work with J-STD-001 is covered in How do J-STD-001 and IPC-A-610 differ?. For how to make a temperature profile, the table of contents of IPC-7530A lists topics such as thermocouple attachment, a separate profile for each board, measuring instruments, SPC and machine verification.

How the thermocouples are fixed directly affects whether the profile can be trusted; see How to attach thermocouples for reflow profiling.

What Jiahon can help with:

  • How to choose a reflow profiler: a side-by-side comparison of the labelled specifications of three brands; accuracy is ±0.5°C for all, and the differences are resolution, memory, sampling speed, start method, power-loss protection and process window index (PWI) software. The page also reminds you that customer audits usually require measuring equipment to have traceable calibration records, so ask about calibration service and interval before buying. There are also specification sheets for 12-channel and 24-channel units, and the heat shield box temperature resistance table.

  • Oven temperature measuring wire: the Teflon type 0–260°C measures reflow ovens; the glass fibre type 0–480°C measures wave soldering; two wire diameters, the thicker 0.255 mm resists bending and the thinner 0.127 mm responds faster; the hot-end solder joint is advised to be kept at 1–2 mm. The page carries a test report that Jiahon itself sent for testing.

  • Fixture and condenser spray rotary cleaning machine: a rotary disc 1 metre in diameter, spraying from top, bottom and sides, with washing, rinsing and drying fully automatic; it can wash condensers, fixtures and precision metal parts. For the link between a condenser that is not clean and unstable oven temperature or misjudgement, see Unstable reflow oven temperature and a high AOI false-call rate?

  • Reflow oven accessories: exhaust ducts, hot-air motors and others have several more pages, please ask by oven model. Jiahon has no product page for the reflow oven itself.

  • Digital microscope: for visual inspection after the oven; 7-inch screen, 1–1200× continuous zoom, adjustable lens angle to avoid glare, photos and video can be saved as quality records (the advanced model comes with a 32G card).

  • Jiahon has no product page for the body of an AOI or in-circuit test (ICT) machine.

Stage ⑤: floor environment and ESD: temperature and humidity, grounding, people and supplies

Environment and electrostatic discharge (ESD) questions do not belong to any one station, and the auditor looks along the whole line. The “handling” chapter of IPC-S-816 lists ESD checks in question form: are machines and workstations grounded, is there environmental control such as ionizing fans, are people trained and using wrist straps, have packaging containers been reviewed, and are ESD-sensitive parts identified and protected.

ItemWhat the audit asksWhat to bring out
Temperature and humidityDo sensors record continuously in the manufacturing area? Is there evidence of action when out of limits?Recording curves and out-of-limit handling records (see How much should factory temperature and humidity be controlled for how)
GroundingAre machines, workstations and fixed racks grounded? Is the ground-to-earth impedance measured at least once a year?Grounding measurement records and specification
Resistance to groundIs the resistance to ground of fixtures, work surfaces and racks measured periodically with ESD instruments?Periodic measurement records
PeopleDoes everyone seated at work wear a corded wrist strap? Are wrist straps and heel straps tested at every wearing?Daily test records; continuous monitoring records
Marking and storageAre ESD areas marked? Is the right material used for parts stored outside the area?Area marking; storage rules

ESD verification is a requirement of ANSI/ESD S20.20: the description by the ESD Association (ESDA) says the standard requires a “compliance verification plan”, and verification includes routine checks of the technical requirements in the plan, at a frequency set by the usage, durability and failure risk of that control item. ESD TR53 gives periodic test methods for each item (grounding system, work surfaces, wrist straps, flooring, ionizing fans, chairs, carts, packaging and so on). For how often to test a wrist strap, see How often should an ESD wrist strap be tested?; for the logic of overall protection, see Complete guide to ESD protection.

Per older material consulted, auditors have also pointed out: the test room had no temperature and humidity control, and the workbench had no ESD protection. Defects of this kind are not a lack of equipment, but an area that was never checked.

What Jiahon can help with:

Stage ⑥: documents, traceability and replying to findings

What was prepared in the first five stages has to be tied together by documents afterwards, and findings must be replied to after the audit. Per older material consulted, findings after audits often fall in the categories below.

Type of findingWhat the auditor sawWhat to add
Sign-off not completedThe confirmation sheet for the reflow profile was signed after work started, or not signedWrite “complete the profile, compare with the criteria, sign, then start the line” into the instruction, and post it
Control plan does not cover itA double-sided board has just one side written; a process no longer run is still there; a control item the floor has (for example nitrogen for baking) is not in the planCompare the control plan against the floor station by station and update them together
Maintenance sheet has gapsThe maintenance sheets of printer, mounter, reflow oven and cleaning machine lack target values to be measured and actions to takeAdd target values and the action when out of limit
Records mixed togetherThe product record of a test is on the same sheet as the daily check sheetSplit into two
Measurement system not explainedThe auditor asked how SPI and AOI are confirmed to measure accuratelyCalibration plan and records (for example annual SPI calibration, AOI automatic calibration)
Cannot trace back after an incidentWhen a problem was found, just the two boards before it were screened, with no procedure for “how far back to trace”An exception-handling flow: how many batches to trace back and how to judge
Items on the floorExpired samples left beside a station; no temperature and humidity control in the test room; no ESD protection at the workbenchKeep beside the station just what the current shift needs; check each area item by item
Changes and labellingNo procedure for engineering change notices and the release of test programs; the wrong template used for label content; no working rule for where to put a labelA flow chart and check steps

The format of replying to findings, per older material consulted, is often done like this:

  • Before-and-after comparison: attach a photo or document to each item, so that the auditor sees at a glance what was changed.

  • Short-term and long-term actions kept apart: short-term is containment first, long-term is correcting the rule, each with an owner and a completion date.

  • Corresponding documents stated clearly: for example, which clause of which instruction was changed, and which version the control plan was updated to.

  • Answer the follow-ups in advance: the auditor will ask where the specification is, how to read the record, and who judges; attach the answers in the reply.

The accuracy of measuring equipment is another item often followed up; for how to verify a gauge, see GR&R (gauge repeatability and reproducibility).

What Jiahon can help with:

  • Industrial wide-format barcode printer: resolution 300 dpi, maximum print width 219.5 mm, interfaces such as Ethernet, USB and RS-232, and can connect to ERP; for traceability labels and batch labels. Three-proof thermal label paper is waterproof, oil-proof and scratch-proof, with sizes made to order; for which barcode to use, see Code 39 vs Code 128.

  • Jiahon does not offer audit coaching, ghost-writing of documents, or the bodies of SPI, AOI and ICT equipment.

If you need a solder paste warming-up machine, first-in-first-out fixture, stencil tension meter, stencil inspection machine, cleaning machine, nozzle cleaning machine, reflow profiler, temperature measuring wire, ESD test instruments or a temperature and humidity recorder, you are welcome to contact Jiahon.

Further reading

To follow the related process steps through, read these next:

Notes: sources and exceptions

This part is for people who need to check; skipping it does not change the practices above. For the clauses of standards, follow the official text; when the audit form, specifications and solder paste maker documents your customer gives differ from this article, follow them.

Where each practice comes from

PracticeContentSource
Structure and scoring of the audit formA common PCBA supplier audit form: divided by station; three outcomes per question, done, not done, not applicable; about 80% of the total score as the pass line; a single station below about 80% is downgraded; the supplier self-assesses first and explains to the auditor before the meeting; documents and evidence ready at the auditOlder material Jiahon consulted (a single form, with no public document to compare)
Public documents arranged by stationChapters arranged as handling, incoming inspection, adhesives, solder paste application (stencil printing, screen printing, dispensing), component placement, reflow, cleaning and repair; each chapter lists common conditions, causes and suggested corrections; the “handling” chapter lists ESD checks in question formIPC-S-816
StencilsStencil data and aperture list, ordering, the user’s inspection and verification, cleaning, scrapping; deciding wiping frequency, cleaning misprinted boardsIPC-7525C (table of contents), IPC-7526A (table of contents)
Board handlingReceiving, storage location, after opening, production environment (temperature, humidity, atmosphere), storage containers on the floor, soldering workIPC-1601A (table of contents)
Temperature profileThermocouple attachment, a separate profile for each board, measuring instruments, SPC, machine verification, thermocouple types and wire diametersIPC-7530A (table of contents)
DPMOIn-process DPMO and estimated yield; end-item DPMOIPC-9261A (table of contents and scope), IPC-7912A (table of contents)
Appearance standardAcceptance conditions for the appearance of assembliesIPC-A-610J (table of contents); for the difference from J-STD-001 see How do J-STD-001 and IPC-A-610 differ?
ESD verificationSet up a compliance verification plan; verification includes routine checks; frequency by usage, durability and failure risk; TR53 provides periodic test methods and scopeESDA, Testing Installed ESD Protective Products
Findings and repliesTypes of findings after audits and the format of replies (before and after, short and long term, owner and deadline)Older material Jiahon consulted (several post-audit finding reply presentations, with names removed)

This describes the general case, and individual cases still vary.

Exceptions and limits

  • A single form: the pass line, scoring method and questions come from one customer audit form Jiahon consulted earlier; different customers have different questions and pass lines, so follow the form your customer gives you.

  • Scope: this article covers the three stations of printing, placement and reflow, plus environment, ESD and documents; hand insertion, wave soldering, circuit test, final inspection and repair/rework are outside it; for proving cleanliness, see How do you prove a circuit board is clean?.

  • Findings are a generalization: the types of finding in Stage ⑥ are generalized from several audit records, with the names of customers, suppliers and people removed, and do not represent any one company’s audit.

  • Limits of public documents: IPC-S-816 is a 1993 document; for the other IPC documents this site read just the table of contents or scope, so for clauses and values see the official text.

  • The floor decides: documents complete but the floor not compliant counts as nothing; conversely, done on the floor but with no record earns no points either.

  • Product information: specifications follow each product page; the stencil inspection machine is currently pre-order.

  • Equipment: Jiahon has no product page or service for the mounter itself, the reflow oven itself, SPI, AOI, ICT, or audit coaching.

Source references

For the standards cited in this article, please follow the current version of each issuing body.

This article is a summary of the general case. It is not the text of any audit form, not a restatement of the clauses of any standard, and not an endorsement of your process. Please follow the audit form and specifications your customer gives you, the edition of the standard you adopt, the solder paste maker’s documents, and your own verification; this is the general case, and individual cases still vary.

Back to top